Checklist de due diligence de fornecedores de rodas-gigantes

Everything a buyer should verify before signing, in one checklist: documents, factory evidence, tests and the contract clauses that make them binding.

1. The document set

  • Structural calculation and design review against the applicable regional standard
  • Material certificates and qualified welding records
  • Cabin door interlock and restraint verification
  • Rendibilidade de acionamento e freio com travas de segurança
  • Relatórios de ensaios sem carga e sem carga
  • Operator and maintenance manuals with inspection intervals
  • Spare parts list and the three-year recommended kit

2. Factory and pre-shipment evidence

  • A recent pre-assembly of the model being quoted, with photos and the test record
  • Dimensional control on the rim and spokes so the wheel runs true
  • Component testing for the drive, brakes and control cabinet
  • A third-party inspection that can be arranged before packing
  • Packing marked in the erection sequence and checked against the packing list

3. The contract clauses that make it binding

Write these into the agreement
ClauseWhy it matters
Safety file as a named deliverableTurns documentation from a promise into a delivery item
Payment tied to test milestonesPre-shipment and commissioning become documented events
Inspection and training scopeThe daily, weekly and annual plan is agreed before handover
Spare parts and response timeAfter-sales is defined instead of assumed
Acceptance criteria and standardsThe regulator, standard and tests are fixed in writing

4. How to use the checklist

Verification order

  1. Request the file structure

    Ask for the document list for a recent delivered wheel, not only the model being quoted.

  2. Verify the factory

    Visit, or request a live walk-through of the workshop and the current pre-assembly.

  3. Check the test records

    No-load and full-load reports exist before shipment, not after the site complains.

  4. Fix the contract

    Move the checklist items into the agreement with their own milestones.

Due diligence is not about catching a dishonest supplier; it is about confirming that the discipline shown in the quotation will continue through fabrication, testing and handover. A wheel is built over months and operated for decades, so the evidence gathered before signing is the same evidence that protects the owner later. When every item on this list has a name, a date and an owner in the contract, the inspection milestones become routine events rather than last-minute arguments, and the handover file is complete before the first passenger boards.

Key takeaway: verify the process, not just the certificate. Material certificates, weld records, a current pre-assembly and the no-load test report are what let an owner confirm a factory rather than trust a claim.

5. Evidence of repeatability, not one good project

  • The record structure for the last three delivered wheels of a comparable height
  • Pre-assembly and no-load test records with dates and the model clearly shown
  • Material and welding certificates that trace the joint back to the batch
  • Inspection frequency and third-party inspection scope confirmed in writing
  • Spare parts lead times and the support response time stated

6. The contract clauses that protect the buyer

Red-line clauses and what they protect
ClauseWhat it protects
Title transfer and riskWhen ownership and responsibility pass for goods in transit
Delay and force majeureThe remedy if production or installation slips
Acceptance criteriaThe tests and standards that define handover
Warranty and spare partsThe coverage period and parts availability
Liability and insuranceThe caps, exclusions and coverage during delivery
Governing law and disputesWhich law applies and how disputes are resolved

Due diligence FAQ

How far back should the evidence go?

Recent is what matters. A single historic project proves less than a current pre-assembly and the record structure for the last few delivered wheels, which shows the process is repeatable.

What if a supplier refuses the checklist?

Treat the refusal as information. A manufacturer that fabricates steel and tests it has nothing to hide; one that cannot show the records is asking you to trust a claim you cannot verify.