Dinis Ferris Wheel · Observation Wheel Manufacturer

120 m Ferris Wheel

The largest wheel in the Dinis range: 120 m, 48 spherical cabins and 288 passengers per cycle.

  • 120 mEquipment height
  • 288Passengers
  • 75 kWDrive power

The 120 m wheel is the flagship of the range and a major tourism investment. Forty-eight spherical cabins carry 288 passengers on a 25-minute observation cycle. At this scale the wheel is planned as a destination: transport, ticketing, F&B, lighting and event programming are designed together so the asset works around the clock.

120 m Ferris Wheel technical data
Equipment height120 m
Rotation diameter112 m
Cabins48 spherical cabins
Passenger capacity288 persons
Rotation cycle25 min per revolution
Drive power75 kW
Total power220 kW
Footprint115 x 60 m

120 m Giant Observation Wheel Engineering & Price

120 m structure and flagship scale

The 112 m diameter carries a large moving mass, and the construction sequence is planned with the crane and logistics providers before fabrication.

The 120 m flagship carries 48 spherical cabins on a 112 m rotation diameter, which is a large moving mass. The support, rim and cabin ring are calculated for wind, seismic and fatigue combinations, and the construction sequence is planned with the crane and logistics providers before fabrication.

The factory checks the rim run-out and the cabin hanger alignment during pre-assembly, because 48 spherical cabins on a 112 m diameter will reveal a small error as a visible wobble. The run-out record is the baseline for the first annual inspection.

The 120 m wheel is the largest standard model, with a 112 m rotation diameter carrying 48 spherical cabins. At this scale the structure is planned as infrastructure: wind and seismic analysis, transport, ticketing, F&B and event programming are designed together. The support, rim and cabin ring are calculated for the 25-year design life and the destination environment.

The flagship scale changes the engineering discipline. Fatigue, wind dynamics and foundation behavior are studied rather than estimated, and the construction sequence is planned with the crane and logistics providers before fabrication begins. Pre-assembly of major sub-assemblies in the workshop de-risks the site erection.

120 m drive and total power

The 220 kW total power is protected on separate circuits, and the substation and backup power are specified as part of the safety case.

The 75 kW drive and 220 kW total power show how much of the load is cabin, lighting and auxiliary systems rather than propulsion. The substation and backup power for evacuation and lighting are specified as part of the safety case, not added later.

The control cabinet is wired and tested against the 220 kW total power, so the 75 kW drive, the cabin and lighting loads and the backup systems are protected on separate circuits. The substation and backup power are specified as part of the safety case.

The 75 kW drive moves 288 passengers on a 25-minute cycle, and total power is 220 kW with the cabin, lighting and auxiliary loads included. The electrical design is a single integrated system, and the substation and backup requirements are coordinated early with the utility provider.

The control system supervises speed, door interlocks, emergency stop and wind monitoring, with remote monitoring as standard for an asset of this value. Backup power for evacuation and lighting is specified as part of the safety case, so the electrical design is finalized before the structural contract closes.

120 m 48 spherical cabin experience

The slow-speed creep mode lets the crew position a spherical cabin precisely for assisted boarding.

The boarding plaza is planned for the higher guest flow, and the cabin experience is designed with F&B, ticketing and events as one destination.

Forty-eight spherical cabins on a 25-minute cycle give a premium observation product, and the boarding plaza is planned for the higher guest flow. The cabin experience is designed with the surrounding F&B, ticketing and event programming as one destination.

Forty-eight spherical cabins on a 25-minute cycle give a premium observation product, and the boarding plaza is planned for the higher guest flow. The cabin experience is designed with the surrounding F&B, ticketing and event programming as one destination.

Forty-eight spherical cabins with panoramic glazing give guests a premium observation experience on a 25-minute cycle. Air conditioning, glass floors, intercom and media are available, and the cabin experience is designed with the surrounding F&B, ticketing and event programming to turn the ride into a destination.

Cabin upgrades change weight and electrical load, so they are fixed before the structure and wiring are finalized. The factory fits and tests the cabins during pre-assembly, and the boarding platform is planned for the higher guest flow of 48 six-seat cabins.

120 m site, foundations and civil works

The 115 x 60 m footprint is the equipment envelope, and the foundation concept is developed against a detailed geotechnical report.

The 115 x 60 m footprint is the equipment envelope, and the site plan adds swing clearance, queue, boarding plaza, transport access and service areas. The foundation concept is developed against a detailed geotechnical report in parallel with the wind study.

The 115 x 60 m footprint is the equipment envelope, and the site plan adds swing clearance, queue, boarding plaza, transport access and service areas. The foundation concept is developed against a detailed geotechnical report in parallel with the wind study.

The 115 x 60 m footprint is the equipment envelope, and the site plan must add the swing clearance, queue, boarding plaza, transport access and service areas. The foundation concept is developed against a detailed geotechnical report, and the wind study runs in parallel with the concrete design.

At this scale the planning approvals, wind and foundation studies lead the schedule, so they begin as early as the site is fixed. The utility supply, crane access and logistics plan are confirmed before fabrication so the site and production programs run in parallel.

120 m wind, fatigue and certification

The wind, foundation and evacuation studies are documented together so the safety case is complete before acceptance.

The 25-year life is supported by fatigue analysis, and the wind, foundation and evacuation studies are part of the safety case.

The 25-year design life is supported by fatigue analysis and a documented inspection schedule, and the wind, foundation and evacuation studies are part of the safety case. The owner receives the full documentation for local acceptance and insurance.

The 25-year design life is supported by fatigue analysis and a documented inspection schedule, and the wind, foundation and evacuation studies are part of the safety case. The owner receives the full documentation for local acceptance and insurance.

The 120 m structure is reviewed for wind, seismic and fatigue load combinations, and the foundation and wind studies are part of the safety case. The design can be mapped to EN 13814, ASTM F2291 or GB 8408, and the documentation includes structural calculations, material and welding records and a no-load test report.

Door interlocks, restraint checks, emergency stop and wind monitoring are tested during commissioning, with evacuation and backup power verified as part of the acceptance. The 25-year design life is documented through fatigue analysis and the inspection schedule for local acceptance and insurance.

120 m throughput and destination economics

Maintenance for the flagship adds the air-conditioning, LED and backup power systems to the standard cadence, and remote monitoring protects uptime. A closure on the flagship is the most visible and costly, so the inspection plan is written conservatively.

The air-conditioning, LED and backup power systems join the annual inspection scope, and remote monitoring protects uptime. A closure on the flagship is the most visible and costly, so the inspection plan is written conservatively.

With 288 passengers per cycle and a 25-minute revolution, the theoretical throughput is about 690 passengers per hour before boarding efficiency. The destination economics come from dwell time, media sponsorship, F&B and events around the wheel, not only the hourly number. The calculator below shows the throughput relationship.

Maintenance follows the daily, weekly, monthly and annual cadence, with the air-conditioning, LED and backup systems added to the inspection scope. A three-year recommended spare parts kit and remote monitoring protect uptime, because a closure on a flagship wheel is the most visible and costly.

120 m Ferris wheel throughput calculator

Adjust passengers per cycle and cycle time to estimate throughput for the 120 m model.

120 m Ferris Wheel FAQ

How long is one revolution on the 120 m wheel?

One revolution takes 25 minutes at the designed speed. The slower cycle is intentional: it makes the ride an observation experience and supports steady, premium boarding rather than maximum spin frequency.

What cabins are used on the 120 m model?

The 120 m model uses 48 spherical cabins with panoramic glazing. Air conditioning, glass floors, intercom and media options are available, and the cabin package is fixed before the structure and electrical design are finalized.

What is the total power demand?

Total power is 220 kW, with 75 kW for the drive; the balance covers cabins, lighting and auxiliaries. The substation and backup power requirements are coordinated early with the utility provider.