Dinis Ferris Wheel · Observation Wheel Manufacturer
49 m Cable-Stayed Ferris Wheel
A cable-stayed structure with 20 spherical cabins and 120-passenger capacity for a lighter, more premium visual signature.
- 49.8 mEquipment height
- 20Spherical cabins
- 120Passengers
The 49 m cable-stayed wheel uses a steel-cable structure and spherical cabins for a lighter, more contemporary look than a truss wheel of the same height. Six-passenger spherical cabins give each guest a wider field of view, and the cable structure reduces the visual mass of the wheel against the sky. It is specified for lakeside, ridge and premium resort settings where appearance and comfort matter as much as capacity.
| Equipment height | 49.8 m |
|---|---|
| Rotation diameter | 44.6 m |
| Structure | Cable-stayed (steel cable) |
| Cabins | 20 spherical cabins x 6 persons |
| Passenger capacity | 120 persons |
| Rotation cycle | 12.1 min per revolution |
| Drive power | 17.6 kW |
| Footprint | 20 x 50 m |
49 m Cable-Stayed Ferris Wheel Engineering & Price
49 m cable-stayed structure and tension path
The cable tension is recorded during installation and becomes the baseline for the scheduled checks, because a loose stay changes the whole load path.
The cable-stayed form is a tension structure, so its integrity depends on the stays holding their calculated pre-tension. Installation records the tension of each cable, and those records become the baseline for the scheduled checks, because a loose stay changes the whole load path.
The mast and stay anchors are surveyed before erection, because the cable geometry depends on the anchor positions being true. A small error at the anchor becomes a visible change in the stay angle, so the survey is checked before the cables are tensioned.
The cable-stayed structure carries the wheel rim on tensioned high-vanadium cables that transfer load back to the mast and foundation anchors. The rim remains a continuous ring that supports the 20 spherical cabins, while the cables keep the visual mass low and the silhouette open. The long 20 x 50 m footprint reflects the geometry of the stays rather than a heavy support truss.
The tension path is the defining feature of the design: each cable is pre-tensioned to a calculated value, and the mast and anchors are sized for the combined dead, live and wind cases. Cable forces are checked at installation and at scheduled inspections, because the long-term integrity of the wheel depends on the stays holding their design tension.
49 m cable-stayed drive, power and control
The slower 12.1-minute cycle gives the boarding crew more time per cabin, which suits the premium six-seat spherical cabin experience.
The 17.6 kW drive is matched to the slower 12.1-minute cycle, which suits the premium, view-led experience this model sells. The control system keeps the pace steady, and the longer cycle gives the boarding crew more time per cabin than a faster family wheel.
The brake and the emergency stop are exercised during commissioning and on the daily check, and the wind monitor is calibrated to the local site. The operator confirms the shutdown threshold during a controlled test rather than discovering it in a storm.
The 17.6 kW drive turns the 44.6 m rotation diameter through a 12.1-minute cycle. The longer cycle suits a premium viewing experience: cabins move slowly enough for guests to absorb the view, and the boarding rhythm stays calm. The standard supply is 380 V / 50 Hz three phase, with the cabin, lighting and auxiliary loads fixed at quotation.
The control system supervises speed, cabin door interlocks and the emergency stop circuit, and a wind-speed monitor is recommended for exposed ridge or lakeside sites. Because the spherical cabins can carry air conditioning, intercom and media, the electrical design is finalized against the chosen cabin specification rather than a generic load.
49 m spherical cabin comfort and field of view
The glazing and the air-conditioning load are designed together, and the premium package is fixed before the electrical design so the HVAC load is sized once.
Spherical cabins add field of view but also solar gain and weight, so the glazing and the air-conditioning load are designed together. The premium package is fixed before the electrical design, because the HVAC load changes the supply and the cabin hanger sizing.
The spherical cabin door is interlocked so the wheel cannot rotate unless every door is confirmed closed, and the restraint check runs before dispatch. The boarding crew follows a steady cadence because a rushed six-seat load is where missed checks happen.
Twenty spherical six-seat cabins carry 120 passengers per cycle. The spherical form gives each guest a wider, less obstructed field of view than a square cabin, which is the main reason operators choose this model for scenic and premium settings. Cabins support air conditioning, glass floor, intercom and media options.
Cabin options affect weight and electrical load, so they are specified before the structure and wiring are finalized. The factory fits and tests the cabins during pre-assembly, which keeps the fit consistent and reduces the work on site. The slower cycle also makes the experience feel like an observation ride rather than a short amusement spin.
49 m cable-stayed corridor site and foundations
The mast and stay anchors are surveyed before the cables are tensioned, because the cable geometry depends on the anchors being true.
The 20 x 50 m corridor footprint follows the geometry of the stays, so the site plan reads as a long strip rather than a square. The mast, the stay anchors and the boarding platform are laid out along that corridor, which is why lakeside and ridge sites suit the model.
The stay anchors and the mast foundation are part of the civil program, and the foundation concept is developed against the soil report. The long corridor layout keeps the service path clear so cable and anchor inspections can be done without closing the ride.
The footprint is long and narrow at 20 x 50 m, so the site is planned as a corridor rather than a square. This suits a lakeside promenade, a ridge line or a resort edge where guests approach along the long axis. The queue, boarding platform and service access are arranged within that corridor.
Foundations anchor the mast and the cable stays, and the foundation concept is developed against the soil report. The concentrated stay loads require a geotechnical review, and the anchors are surveyed during erection to confirm the cable geometry. The civil program is otherwise moderate, with a smaller crane than a truss wheel of the same height.
49 m cable inspection, wind and certification
The safety file carries the cable records from installation through commissioning, and the 25-year service life is supported by a documented replacement interval.
Cable inspection is the defining maintenance item: tension, corrosion and the anchor points are checked on schedule, and the 25-year cable service life is supported by documented replacement intervals. The safety case includes the cable records from installation onward.
The cable records from installation become the baseline for the scheduled tension and corrosion checks, and the 25-year service life is supported by a documented replacement interval. The safety file carries those records so the local authority can review them.
The cable-stayed structure is verified for wind and seismic load combinations, and the cable system is a specific inspection item. The high-vanadium cables have a 25-year service life, with inspection intervals set out in the maintenance plan, and the design review can follow EN 13814, ASTM F2291 or GB 8408.
The safety file includes structural calculations, cable tension records, material and welding certificates and a pre-shipment test report. Door interlocks, restraint checks and emergency stop are tested during commissioning, and wind monitoring is available for exposed sites. The cable inspection and replacement interval is documented before handover.
49 m cable-stayed throughput and maintenance
The economics of the 49 m model favor fewer, higher-value riders over maximum hourly volume, so the throughput calculator is best used to plan staffing and queue length rather than to chase a headline number. The photo point and the premium cabin are the revenue story.
The premium positioning means the operator staffs for experience rather than maximum volume, so the throughput calculator is used to plan queue length and staffing. The photo point and the cabin view are the recurring revenue story.
With 120 passengers per cycle and a 12.1-minute revolution, the theoretical throughput is about 595 passengers per hour before boarding efficiency. The premium positioning often means fewer, higher-value riders rather than maximum hourly volume, so the operating plan should reflect the cabin and pricing strategy. The calculator below shows the throughput relationship.
Maintenance adds cable checks to the standard daily, weekly, monthly and annual cadence. Cable tension and corrosion are inspected at the scheduled intervals, and the three-year spare parts kit covers the drive, brake, cabin and electrical consumables. Remote monitoring watches speed, faults and service intervals between visits.
49 m cable-stayed throughput calculator
Adjust passengers per cycle and cycle time to estimate throughput for the cable-stayed model.
49 m cable-stayed FAQ
What is the difference between cable-stayed and spoke-cable?
Cable-stayed wheels carry the rim on tensioned high-vanadium cables with spherical cabins, while spoke-cable wheels use a central shaft with tensioned spokes. Both give a lighter visual signature than a truss, but the support geometry and inspection focus differ.
What is the cable service life?
The high-vanadium cables have a 25-year service life, with inspection intervals set out in the maintenance plan. Cable tension and corrosion are checked on schedule, and the replacement interval is documented before handover.
Why is the footprint long and narrow?
The 20 x 50 m footprint follows the geometry of the cable stays and mast anchors. It suits lakeside, ridge and resort-edge corridors, and the queue and boarding area are planned along that long axis.
