Dinis Ferris Wheel · Observation Wheel Manufacturer
50 m A-Frame Ferris Wheel
A 50 m A-frame wheel that keeps landmark height while reducing the foundation footprint to 24 x 17 m.
- 49.8 mEquipment height
- 30Cabins
- 120Passengers
The 50 m A-frame wheel pairs the height of the 50 m truss model with a smaller 24 x 17 m footprint. The A-frame support concentrates the structure into fewer foundation points, which is useful on narrow urban plots and sloped sites where a wide truss base cannot fit. Capacity is 120 passengers across 30 cabins.
| Equipment height | 49.8 m |
|---|---|
| Rotation diameter | 45.2 m |
| Structure | A-frame |
| Cabins | 30 cabins x 4 persons |
| Passenger capacity | 120 persons |
| Rated power | 50 kW |
| Drive power | 16 kW |
| Power supply | 380 V / 50 Hz, three phase |
| Footprint | 24 x 17 m |
50 m A-Frame Ferris Wheel Engineering & Price
50 m A-frame structure and concentrated loads
The A-frame members are sized for the concentrated load rather than scaled from the truss, and every joint is treated as a load path.
The A-frame concentrates the same landmark height into a 24 x 17 m base, so the inclined legs carry the wind overturning as axial force. The frame members and their connections are sized for that concentration rather than scaled from the truss version.
The A-frame members and their connections are sized for the concentrated load rather than scaled from the truss, and the factory run-out record becomes the baseline for the annual walkdown. Every joint is a load path, so none is treated as bracing.
The A-frame support reduces the foundation footprint to 24 x 17 m by concentrating the wheel load into fewer points. The 45.2 m rotation diameter and 30-cabin ring are unchanged in concept from the truss model, but the support path is re-formed through inclined legs that turn lateral wind load into axial frame forces.
Concentrating load is efficient for a narrow site but increases the demand on each anchor and frame connection. A geotechnical review is therefore part of the design basis, and the frame members are calculated for the specific site rather than issued from a fixed table. Pre-assembly in the workshop confirms fit before shipment.
50 m A-frame drive and rated power
The utility design is confirmed against the 50 kW rated figure so a summer evening with all systems running does not trip the supply.
The 16 kW drive against 50 kW rated power shows how much of the electrical load is auxiliary: cabins, lighting and the LED scheme. The utility design is confirmed against the full rated figure so a summer evening with all systems running does not trip the supply.
The control cabinet is wired and tested against the declared loads, so a summer evening with the drive, cabin lighting and LED scheme all running does not trip the supply. The fault display names the circuit for fast isolation.
The A-frame model uses a 16 kW drive against a 50 kW rated power. The rated figure includes the cabin, lighting and auxiliary loads that run alongside propulsion, which is why it exceeds the drive figure. Both are confirmed with the utility provider early so the transformer and cables are sized correctly.
The control system supervises speed, door interlocks and the emergency stop circuit, and air-conditioned cabins and LED lighting remain available options. Fixing the cabin and lighting package at quotation keeps the electrical design stable from the first drawing through commissioning.
50 m A-frame 30-cabin capacity and comfort
The platform staging is planned so the exit never crosses the entry, even on a narrow plot.
The queue is arranged as a corridor with the exit separate from the entry, and the slow-speed creep mode supports assisted boarding.
Thirty cabins give 120 passengers per cycle, slightly fewer than the truss, but the boarding flow is similar. The narrower projection means the queue is arranged as a corridor, and the platform staging is planned so the exit path never crosses the entry.
Thirty cabins give 120 passengers per cycle, and the narrower projection means the queue is arranged as a corridor with the exit kept separate from the entry. The slow-speed creep mode lets the crew position a cabin for assisted boarding.
Thirty four-seat cabins carry 120 passengers per cycle, slightly fewer than the truss model but the same comfort envelope. Square cabins can be specified with LED interiors, intercom, themed panels and, subject to the electrical load, air conditioning. The boarding platform is planned along the narrower projection.
The design review verifies cabin sway for the A-frame geometry, so comfort is part of the engineering record. The factory fits and tests cabins during pre-assembly, reducing site work and keeping the guest experience consistent with the workshop standard.
50 m A-frame site, foundations and civil works
The geotechnical review is the critical path for the civil program, and the anchor positions are surveyed before the frame is erected.
The concentrated foundation loads make the geotechnical review the critical path for the civil program. The anchor positions are surveyed before erection, because a small error at the base of the A-frame becomes a larger error at the rim.
The concentrated foundation loads make the geotechnical review the critical path, and the anchor positions are surveyed before erection. A small error at the base of the A-frame becomes a larger error at the rim.
The 24 x 17 m footprint fits narrow urban plots, but the concentrated A-frame loads make the foundation design the critical part. The foundation concept is developed against the soil report, and a geotechnical review is required before concrete is placed. The site plan must still add queue, boarding platform and service access.
On sloped sites the A-frame can simplify the cut-and-fill profile because the support occupies a narrower strip. The civil program is otherwise moderate, with a smaller crane than a truss wheel of the same height. Gathering wind and seismic data early keeps the concrete and production schedules in parallel.
50 m A-frame geotechnical, wind and certification
The pre-assembly step checks the cabin hangers against the frame before the wheel ships.
The design review confirms the same cabin sway limit as the truss, and the pre-assembly step checks the cabin hangers against the frame.
The A-frame geometry is verified for cabin sway so comfort is not traded for land. The design review confirms the same sway limit as the truss, and the pre-assembly step checks the cabin hangers against the frame before shipment.
The A-frame geometry is verified for cabin sway so comfort is not traded for land, and the design review confirms the same sway limit as the truss. The safety file documents that comparison for the local authority.
The A-frame structure is verified for wind and seismic load combinations, and the concentrated foundation loads make the geotechnical review part of the safety case. The design review can follow EN 13814, ASTM F2291 or GB 8408, and the documentation includes structural calculations, material and welding records and a pre-shipment test report.
Door interlocks, restraint checks and the emergency stop circuit are tested during commissioning, and wind monitoring is available for exposed sites. The complete documentation gives the owner a defensible record for local acceptance and the annual inspections that follow.
50 m A-frame throughput and maintenance
Annual maintenance focuses on the A-frame joints and the anchor area, while the drive, cabin and electrical systems follow the standard cadence. The three-year spare parts kit is shared with the rest of the 50 m family.
Annual maintenance focuses on the A-frame joints and the anchor area, while the drive, cabin and electrical systems follow the standard cadence. The three-year spare parts kit is shared with the rest of the 50 m family.
With 120 passengers per cycle, throughput is slightly below the truss model, and actual hourly figures are set by boarding efficiency. The calculator below lets an operator compare the two 50 m structures on throughput and see how cycle time changes the daily result.
Maintenance follows the standard daily, weekly, monthly and annual cadence, with attention to the A-frame connection points and foundation anchors during annual inspections. The three-year spare parts kit and remote monitoring option are shared with the rest of the range.
50 m A-frame throughput calculator
Estimate hourly and daily throughput for the A-frame model.
50 m A-frame FAQ
What is the capacity difference from the truss model?
The A-frame model carries 120 passengers in 30 cabins versus 128 passengers in 32 cabins on the truss model. The A-frame saves land width with a 24 x 17 m footprint, at the cost of slightly fewer cabins.
Why is the rated power higher than the drive power?
Rated power includes the cabin, lighting and auxiliary loads that run alongside propulsion; the drive power is only the propulsion requirement. Both figures are confirmed with the utility provider at design stage.
When should I choose the A-frame over the truss?
Choose the A-frame when width, not height or capacity, is the planning constraint. If the site is wide enough for the truss and you need the extra cabins, the truss model is usually the more economical choice.