Dinis Ferris Wheel · Observation Wheel Manufacturer

65 m Ferris Wheel

The entry point for serious night tourism: 36 six-person cabins, 216 passengers and air-conditioned comfort.

  • 66 mTotal height
  • 216Passengers
  • 20 yrsDesign life

The 65 m wheel is where the observation experience becomes the product. Six-person cabins give families and groups a private viewing space, and the air-conditioned cabin option makes the wheel usable through summer heat. With 216 passengers per cycle and a 13-minute rotation, it supports the steady throughput a night-tourism program needs.

65 m Ferris Wheel technical data
Total height66 m
Rotation diameter61.2 m
Operating height64 m
Cabins36 cabins x 6 persons
Passenger capacity216 persons
Rotation cycle13 min per revolution
Drive power24 kW
Air conditioning power36 x 2 kW = 72 kW
Installed capacity114 kVA
Design service life20 years
Projection footprint64 x 40 m (equipment), 34 x 40 m (foundation)
Power supply3N+PE 380/220 V, 50 Hz

65 m Ferris Wheel Engineering, Specs & Price

65 m structure and 20-year design life

The six-seat cabin load case is applied to the hanger, rim node and boarding platform together, so the structure is sized for the real occupancy rather than a smaller cabin.

The 65 m wheel carries 36 six-seat cabins, which changes the load case compared with four-seat cabins: the hanger, rim node and boarding platform are all sized for six guests per cabin. The structure is calculated for those loads across the 20-year design life.

The factory checks the rim run-out and the cabin hanger alignment during pre-assembly, because 36 six-seat cabins on a 61.2 m diameter will reveal a small error as a visible wobble. The run-out record is the baseline for the first annual inspection.

The 65 m wheel is a fixed installation with a 20-year design life, so the structure is treated as infrastructure rather than a seasonal ride. The 61.2 m rotation diameter carries 36 six-seat cabins, and the support and rim are calculated for wind, seismic and fatigue loads according to the destination standard. The foundation and equipment projections are separate figures that both appear in the site plan.

The 20-year life is supported by fatigue analysis on the rotating members and by a documented inspection schedule. Load-bearing structure is excluded from normal wear replacement, while drive, brake, cabin and electrical components follow a replacement cadence. This split keeps the owner clear on what is permanent and what is consumable.

65 m drive, AC load and installed capacity

The 114 kVA installed capacity is wired and tested at the factory, and the substation and cable routes are coordinated with the utility early.

The installed capacity of about 114 kVA is the number that drives the substation, because air conditioning adds 72 kW to the drive and lighting. The cabin specification is therefore fixed before the electrical design, not after the structural order.

The control cabinet is wired and tested against the 114 kVA installed capacity, so the drive, the 72 kW air-conditioning load and the LED scheme are protected on separate circuits. The fault display names the circuit for fast isolation.

The 24 kW drive turns the wheel on a 13-minute cycle, while the air-conditioned cabin option adds 36 x 2 kW and brings the installed capacity to about 114 kVA. The drive, cabin power and LED lighting are designed as one electrical system, so the owner does not coordinate separate propulsion, HVAC and lighting vendors.

Installed capacity should be confirmed with the utility provider early, because the substation and cable sizing depend on the final cabin specification. The control system supervises speed, door interlocks and emergency stop, and the air-conditioning and lighting circuits are protected and monitored through the same cabinet.

65 m 36 six-seat cabin experience

The 13-minute cycle is paced for six-seat cabins, and the platform is staged for two cabins so a slow group does not stall the rim.

The 13-minute cycle is long enough to feel like an observation experience, and the boarding rhythm is paced for six-seat cabins. The operator benefits from staging two cabins at once, which keeps the cycle steady when a group needs longer to board.

The 13-minute cycle is paced for six-seat cabins, and the platform is staged for two cabins so a group that needs longer to board does not stall the rim. The slow-speed creep mode positions a cabin precisely for assisted boarding.

Thirty-six six-seat cabins give families and small groups a private viewing space rather than a shared bench. Air conditioning keeps evening and summer sessions comfortable, protecting revenue through the heat, and the cabins can carry glass floors, intercom and media options. The 13-minute cycle feels like an observation experience.

Cabin upgrades change weight and electrical load, so they are fixed at quotation. The factory fits and tests the cabins during pre-assembly, which keeps quality consistent and shortens the site program. The larger cabin also changes the boarding geometry, so the platform and queue are planned for six guests per cabin rather than four.

65 m site, foundations and civil works

The 64 x 40 m projection and the 34 x 40 m foundation are separate figures, and the swing clearance is reserved around the larger envelope.

The 64 x 40 m equipment projection and the 34 x 40 m foundation footprint are separate figures that both appear in the site plan. The larger envelope is the swing clearance, and the queue, boarding platform and service access sit around it.

The 64 x 40 m projection and the 34 x 40 m foundation are separate figures in the site plan, and the swing clearance is reserved around the larger envelope. The queue, boarding platform and service access sit around that envelope.

The equipment projection is about 64 x 40 m and the foundation footprint is 34 x 40 m, so the site plan must reserve the larger envelope for the swing of the structure. The queue, boarding platform and service access sit around that envelope. Foundations are prepared to the approved drawing after a geotechnical review.

Civil works are a major schedule item at this scale, and the foundation drawings should be issued as soon as site data is confirmed. The planning height clearance, wind and seismic inputs and the utility supply are gathered early so the concrete program and wheel production run in parallel.

65 m wind, fatigue and certification

The fatigue analysis is documented in the handover file, and the load-bearing structure is excluded from normal wear replacement.

The 20-year design life is documented through fatigue analysis, and the owner receives a clear split between permanent structure and replaceable components.

The 20-year design life is supported by fatigue analysis on the rotating members, and the inspection schedule documents what is permanent and what is consumable. The owner leaves handover with a clear split between load-bearing structure and replaceable components.

The 20-year design life is documented through fatigue analysis and the inspection schedule, with the load-bearing structure excluded from normal wear replacement. The owner receives a clear split between permanent structure and replaceable components.

The 65 m structure is reviewed for wind, seismic and fatigue load combinations, and the design can be mapped to EN 13814, ASTM F2291 or GB 8408. The safety file includes structural calculations, material and welding records, a no-load test report and the option of third-party inspection before shipment.

Door interlocks, restraint checks, emergency stop and wind monitoring are tested during commissioning. The 20-year design life is documented through the fatigue analysis and the inspection schedule, giving the owner a defensible record for local acceptance, insurance and recurring inspections.

65 m throughput and night-tourism economics

Night-tourism economics change the maintenance scope: the air-conditioning and LED systems join the inspection checklist, and the annual walkdown includes the electrical loads that run after dark. Remote monitoring watches those systems between visits.

The air-conditioning and LED systems join the annual inspection scope, and remote monitoring watches those systems between visits. The evening product depends on them, so their maintenance is treated as a revenue issue rather than a cost.

With 216 passengers per cycle and a 13-minute rotation, the theoretical throughput is about 1,000 passengers per hour before boarding efficiency. The night-tourism value comes from extending operating hours with LED media and air-conditioned cabins, not only from the hourly number. The calculator below shows the throughput relationship.

Maintenance follows the daily, weekly, monthly and annual cadence, with the air-conditioning and LED systems added to the inspection scope. A three-year recommended spare parts kit and the optional remote monitoring service protect uptime through the peak season, when a short closure is most costly.

65 m Ferris wheel throughput calculator

Adjust passengers per cycle and cycle time to estimate throughput for the 65 m model.

65 m Ferris Wheel FAQ

Can the 65 m cabins be air-conditioned?

Yes. The air-conditioning load is 36 x 2 kW and is included in the 114 kVA installed capacity. Air conditioning protects evening and summer revenue and should be confirmed at quotation so the electrical design is sized correctly.

What is the design life of the 65 m model?

The 65 m model is designed for a 20-year service life as a fixed installation, with the main load-bearing structure excluded from normal wear replacement. Drive, brake, cabin and electrical components follow a documented replacement cadence.

What is the rotation cycle and throughput?

One revolution takes about 13 minutes. With 216 passengers per cycle, the theoretical throughput is roughly 1,000 passengers per hour before boarding efficiency, which varies with the cabin and queue design.